亚洲乱妇老熟女爽到高潮的片-在线观看黄的网站-黄色va视频在线观看-国产特级毛片aaaaaa高清-亚州精品成人av-国产亚洲1区2

Welcome to Suzhou Xinrongfa Metal Products Co., Ltd.
CN EN

Adhering to quality is the life of an enterprise

Coating spraying of Teflon, tungsten carbide and alumina

Service hotline:

15995489385

+ Wechat number:wechat number

Your location: Home > Information dynamics > Industry dynamics

Recommended products

National Service Hotline

15995489385

Introduce the nine operating steps of ptfe lining

Source:en      Release date: 2022年05月20日
Information summary:With the continuous improvement of high temperature resistance and corrosion resistance requirements of materials, ptfe lining has gradually entered people's field of vision.
With the continuous improvement of the requirements for high temperature resistance and corrosion resistance of materials, ptfe lining has gradually entered people's field of vision. Relying on its good physical properties, it has been affirmed by many customers, but the specific steps for this type of spraying What is it like? I think many people don't know much about it and are very interested in it. To this end, I will introduce the nine steps of ptfe lining: Step 1: Check     whether there are pores, deformations, gaps and other poor welding conditions on the
     surface of the sprayed material .      Step 2: Preparation     1. Grinding: Use an angle grinder to carefully grind the burrs, welding slag, sharp corners, and sharp corners on the surface of the material.     2. Degreasing: Use 420 ℃ high temperature degreasing for empty burning, set the holding time according to the size and weight of the workpiece, and burn off the residual oil of the material.     3. Surface roughening: sandblasting adopts 5 to 7 kg air pressure, and the surface of 20# gold steel sand is evenly sandblasted.      Step 3: Pre-treatment of ptfe spraying     1. Put the workpiece on the inner shelf of the oven.     2. Use an air gun with a pressure of not less than 5kg to blow off the dust on the sandblasted surface.     3. Before spraying, the material is preheated and dried to remove the residual water on the surface.      Step 4: Preparation before primer spraying     1. Carry out vulcanization treatment 10 minutes ahead of the spray primer.     2. Check whether the powder output, static electricity and air pressure of the electrostatic spray gun are normal. If there are any abnormal problems, they should be solved in time to ensure smooth spraying.     3. Wear protective masks, glasses and dustproof clothing.      Step 5: Primer spraying     1. The material used is ECTFE special primer, and the specific type of primer is selected according to customer requirements.     2. The thickness of the sprayed film is about 0.16 mm, and the baking temperature is 280 °C.
     Step 6: The preparation work before
    coating is similar to primer spraying. Vulcanize the coating material 10 minutes in advance, and check whether the powder output, static electricity and air pressure of the electrostatic spray gun are normal. If there are any abnormal problems, they should be solved in time. Ensure smooth spraying.
     Step 7: Coating operation
    1. The material used is ECTFE type.
    2. The thickness of each spraying film is between 0.15mm-0.25mm.
    3. The sintering temperature is 260°C, and the holding time will vary according to the size and weight of the sprayed material.
    4. Repeat spraying and sintering.
     Step 8: Detect the coating
    1. Use a film thickness gauge to measure the thickness of the ptfe lining to check whether it meets the corresponding standard.
    2. Check the surface for chromatic aberration, sand, sagging, etc.
    3. Laser detection is carried out on the surface of the material through the coating detection technology, and no sparks are generated as the standard.
     Step 9: Pack and transport the materials. Pack the materials
    with bubble wrap and pearl cotton to avoid bumps and damages during transportation.
     The above is a brief introduction to the ptfe lining process. If you want to know more details, welcome to our Suzhou Xinrongfa Metal Products Co., Ltd. for consultation and understanding.
主站蜘蛛池模板: 欧美日韩一区二区高清不卡 | 极品白丝美女在线出水 | 日韩精品影视 | 亚洲色偷偷综合 | 午夜福利理论片高清在线 | 日韩一区二区三区国产高清 | 国产午夜福利六区 | 成人看片黄a免费看在线 | 91青青操 | 国产精品高清视亚洲一区二区 | 午夜性福利 | 综合 亚洲 制服 | 亚洲国产精品色区 | 含羞草天堂影视乱码 | 午夜男女爽爽影院视频在线 | 激情小说一区二区 | 亚州一区二区三区在线视频 | 蜜桃成熟时1997 | 精品黑色丝袜在线观看 | 欧美一区二区三区电影 | 日本亚洲一区二区三区 | 91po国产在线精 | 99ri精品 | 亚洲一区亚洲二区 | 宅男色影视亚洲人在线 | 国产精品免费视频网站 | 五月天中文字幕在线 | 亚洲综合网址 | AⅤ成人金莲在线观看 | 日本激情一区二区三区 | 91一区精品视频在线观看 | 中日韩欧美风情视频 | 91青青草| 亚在线观看免费视频入口 | 枫富爱中文字幕制服一区 | 国产精品日韩视频 | 日韩伦精品一区二区三区一级 | 老熟女区二区三区 | 国产精品第一国产精品 | 美女视频免费的黄的 | 亚洲人成77在线播放网站 |